Why in News?
The Varuna Elevated Corridor is a ₹10,998 crore NHAI project in Varanasi that integrates urban mobility, heritage preservation, and economic connectivity by linking NH-31 to the Varanasi Ring Road (Varuna River corridor) via a 43.218 km elevated.
Architecture & Alignment
- Lane Layout: Designed as a predominantly elevated 6/4 lane divided carriageway featuring dedicated flyovers, loop ramps, and service roads.
- Special Features: Includes a signature cable-stayed bridge and a unique multi-span extradosed Foot Over Bridge-cum-Major Bridge for pedestrian safety.
- Designed Speed: Engineered to support safe operating speeds ranging between 80–100 km/h.
- Implementation Model: Constructed under the Hybrid Annuity Model (HAM).
Budgetary Breakdown
- Total Project Cost: Capital cost is estimated at ₹10,998.32 crore.
- Civil Construction: Allocates ₹4,565.33 crore for core structural building and utility shifting.
- Land Acquisition: Allocates ₹934.91 crore to obtain required right-of-way permissions.
Traffic Decongestion & Travel Benefits
- Airport Transit: Drastically cuts down travel time between Varanasi Junction and Lal Bahadur Shastri International Airport from roughly 60 minutes to just 20 minutes.
- Railway Connectivity: Reduces commuting time between NH-31 and Kashi Railway Station from 40 minutes down to 20 minutes.
- Key Bottlenecks Solved: Relieves heavy daily pressure at notoriously crowded junctions including Varanasi Junction, Phulwaria, and Chaukaghat.
- Heritage Preservation: Adds substantial transit capacity to historical zones without needing extensive, destructive road-widening in older neighborhoods.
- Multi-Modal Hubs: Strengthens direct access to Varanasi Cantt, Deen Dayal Upadhyaya Junction, Ramnagar Port, Namo Ghat, and the Kashi Vishwanath Temple area.
- Logistics Boost: Smoothly integrates freight movement across six major regional logistics hubs, facilitating trade of agricultural produce, construction materials, and industrial goods between Varanasi and Chandauli.
Download Pdf