Siang Upper Multipurpose Project (SUMP)

Why in News?
The proposed Siang Upper Multipurpose Project (SUMP) in Arunachal Pradesh has faced renewed opposition from local communities over concerns regarding displacement, environmental damage and loss of ancestral land. In September 2026, the state government formed a high-level committee to coordinate preliminary feasibility surveys and facilitate dialogue with affected communities.
 

About the Project
  • Location: Siang River, Arunachal Pradesh, near the India–China border.
  • Capacity: Approximately 11,200 MW, making it one of India's largest proposed hydropower projects.
  • Type: Large multipurpose storage-based hydropower project.
  • Implementing Agency: NHPC Limited has been entrusted with preparing the Preliminary Feasibility Report (PFR).
  • River: Siang, which is known as the Yarlung Tsangpo in Tibet and becomes the Brahmaputra downstream in Assam.
Major Objectives
  • Hydropower Generation: Generate large-scale renewable electricity to meet India's growing energy requirements.
  • Flood Management: Regulate river flows and help moderate downstream flood risks in the Brahmaputra basin.
  • Water Security: Provide a storage mechanism to manage potential changes in transboundary river flows.
  • Regional Development: Generate employment, improve infrastructure and promote economic development in Arunachal Pradesh.
Strategic Significance
  • China is constructing a massive hydropower project on the lower reaches of the Yarlung Tsangpo in Tibet.
  • SUMP is strategically important for India because it could strengthen downstream water management capabilities and address concerns regarding possible upstream flow manipulation.
Major Concerns
  • Displacement: Submergence of villages could affect indigenous Adi communities and their traditional livelihoods.
  • Environmental Impact: Large-scale construction may disturb forests, biodiversity and fragile Himalayan ecosystems.
  • Seismic Vulnerability: The region is highly earthquake-prone, raising concerns about dam safety.
  • Social Concerns: Local communities fear losing ancestral land, cultural heritage and traditional rights.
Current Status
As of November 2026, the project remains at the Preliminary Feasibility Report (PFR) stage. The state government has stated that construction will not be decided without technical studies, environmental and social assessments, and consultations with affected communities.

Download Pdf
Talk to a Counsellor
DIRECT GUIDANCE

Request Submitted!

Thank you! Our senior counsellor will connect with you shortly on your number to help guide your UPSC preparation.