Indore Metro Priority Corridor–2
Why in News?
Indore Metro Priority Corridor–2 was inaugurated on 5 September 2026 by Union Housing & Urban Affairs Minister Manohar Lal, in the presence of Madhya Pradesh CM Mohan Yadav.
Route & Connectivity
- Stretched Distance: The newly opened Priority Corridor–2 spans an 11 km stretch.
- Station Coverage: It adds 11 new stations, running from Super Corridor-3 to Malviya Nagar Chauraha (Malviya Nagar Square).
- Total Network Size: Combined with the initial 6 km section opened in May 2025, Indore's total operational metro network now covers 17 km and 16 stations.
- Key Hubs Connected: The route bridges major gaps between key residential areas, commercial centers, and prominent employment hubs.
Financial & Project Details
- Corridor Cost: The construction of this specific 11-km extension was completed at an estimated cost of βΉ2,850 crore.
- Cumulative Project Cost: The total expenditure for the entire 17-km operational network has now reached approximately βΉ4,370 crore.
- Implementing Body: The project is being executed by the Madhya Pradesh Metro Rail Corporation Limited (MPMRCL).
Operations & Passenger Facilities
- Daily Schedule: Metro trains operate daily from 9:00 AM to 7:00 PM.
- Frequency: Trains are available every 15 minutes, totalling more than 80 scheduled trips per day.
- Modern Amenities: Stations are equipped with digital signage, escalators, elevators, and transit features designed to comply with the Rights of Persons with Disabilities Act.
- Sustainability: The expanded public transport infrastructure aims to significantly reduce vehicular emissions, city traffic congestion, and fuel consumption.
- Urban Policy Alignment: The project aligns closely with the Central Government's Metro Rail Policy 2017, focusing on financial viability and transit-oriented development.
Download Pdf