Critical Mineral Processing Scheme – ₹2,814 crore
 
Why in News?
The CAPEX Support Scheme to Promote Critical Mineral Processing is in the news because the Union Cabinet approved it on 4 November 2026 with a ₹2,814 crore outlay to build India’s domestic lithium and nickel processing capacity.
 

Timeline and Financial Framework
  • Implementation Period: The scheme will operate over five financial years, spanning from FY 2026–27 to FY 2030–31.
  • Budget Allocation: Out of the total ₹2,814 crore fund, ₹2,800 crore is strictly earmarked for direct capital subsidies, while ₹14 crore is set aside for administrative and execution expenses.
  • Investment Leverage: The government estimates this state support will successfully catalyze up to ₹10,000 crore in private sector co-investments.
Infrastructure Target: Four Megaplants
The scheme specifically funds the creation of four major commercial-scale critical mineral processing facilities across India:
  • Two Lithium Processing Plants: Each required to have a minimum operational capacity of 30,000 tonnes (30 kt) per year, converting raw ores/concentrates into high-purity, battery-grade products.
  • Two Nickel Processing Plants: Each required to achieve a minimum capacity of 50,000 tonnes (50 kt) per year, producing Class-1 nickel or battery-grade nickel sulphate.
  • Valuable By-Products: The nickel refining units are also engineered to extract and recover Cobalt as a valuable secondary by-product.
Subsidy Structure and Distribution
  • Capital Incentive Rate: Approved industrial beneficiaries will receive a 30% financial subsidy on their total eligible capital expenditure (CAPEX).
  • Beneficiary Caps: Financial support is strictly capped at ₹500 crore per beneficiary for the lithium facilities and ₹900 crore per beneficiary for the nickel facilities.
  • Competitive Bidding: Plant operators will be selected through a rigorous transparent process: a technical qualification phase followed by financial bidding based on a least-cost criterion (awarded to those asking for the lowest subsidy support).
  • Milestone Tranches: To ensure execution safety, government funds will not be given out all at once but disbursed across three distinct milestone-linked tranches.
Strategic Focus & Downstream Impact
  • Breaking Geopolitical Monopolies: Mineral refining is currently highly concentrated in a few foreign territories (like China). This initiative insulates India from geopolitical trade bans, sudden export restrictions, and global supply line spikes.
  • Fueling Key Sectors: High-purity inputs from these facilities will directly feed India’s high-tech manufacturing, supporting electric vehicles (EVs), Battery Energy Storage Systems (BESS), semiconductors, electronics, defence equipment, and speciality steel.
  • Ecosystem Synergy: The processing push serves as the missing link alongside the National Critical Mineral Mission (NCMM), ongoing domestic critical block auctions, and the Advanced Chemistry Cell (ACC) Battery PLI Scheme.

Download Pdf
Talk to a Counsellor
DIRECT GUIDANCE

Request Submitted!

Thank you! Our senior counsellor will connect with you shortly on your number to help guide your UPSC preparation.